Collierville, TN
Shelby County
The Town of Collierville permits EV charger work through its Building & Codes Division under its amended code.
See Collierville detailsShelby County, Tennessee
Cordova has its own name and identity, but it is not its own city. It is a community inside the City of Memphis. That means a Memphis Cordova EV charger follows Memphis rules and is permitted by the Memphis and Shelby County code office.
Housing here ranges from single-family homes to townhomes and large apartment communities. A homeowner with a garage has a simple path. A renter or townhome owner may need a landlord or association on board first.
This page walks through the code in force, charging in shared housing, and how summer heat affects your panel. Call to speak with a local electrician about your EV charger install.
For the City of Memphis and unincorporated Shelby County, the code in force as of October 2026 is the 2020 NEC with local amendments, known as the 2021 Memphis and Shelby County Joint Electrical Code. Cordova falls under that code because it sits inside Memphis.
Your electrician confirms the edition in force when the permit is pulled, since state rules let local codes change editions. Under NEC Article 625, a charger is a continuous load. A 48 amp charger needs a 60 amp circuit, and your electrician applies the GFCI rules in the edition your permit office enforces.
Cordova's permit office is the Memphis and Shelby County Office of Construction Code Enforcement, not a Cordova city hall. Cordova is not its own city, so there is no separate Cordova permit desk. The office's main line is (901) 222-8300.
Permits here follow city and county lines, not the mailing ZIP. Cordova mail uses 38016 and 38018, but those ZIPs alone do not tell you whether a home is in Memphis or another jurisdiction. Your property tax bill settles it. See permits and inspections for how the process works.
A Tennessee law effective July 1, 2026 says an association may not ban an owner's charger for personal use on the owner's property or in the owner's designated parking spot. It can still set reasonable rules on size, placement, and how the work is done. Check your governing documents, and see condo and HOA EV charging for the details.
Apartment owners and property managers can plan shared chargers through commercial and workplace charging. The TDEC Multifamily Housing Rebate Program may help qualifying properties, and our rebates and incentives page explains how it works.
Cordova summers are hot and humid, and the air conditioner pulls hard on the same panel as your charger. A load calculation adds up both loads before a new circuit goes in. Some homes need a panel upgrade, and some simply set the charger to a lower amperage.
MLGW provides power in Cordova, with TVA as its supplier. MLGW's home-charger incentives, if any, change over time. Confirm the current offer at mlgw.com or with MLGW before you buy.
A Level 2 charger in a Cordova garage is built to the Memphis and Shelby County joint code.
Cordova townhome owners can ask their association about a charger in their designated parking spot.
Cordova apartment communities and offices can plan shared chargers around the building's service.
A Cordova panel that cannot carry a charger and summer cooling may need more capacity.
A readiness check shows a Cordova homeowner what the panel can handle before buying hardware.
FAQ
Yes, Cordova is a community within the City of Memphis. Charger permits come from the Memphis and Shelby County code office. The work follows the same joint electrical code used across Memphis.
A renter needs the property owner's written approval before any electrical work. Many owners agree when the plan is clear and permitted. Your electrician can explain the work to the owner.
Germantown and the Shelby County side of Eads use the same joint code and county office. Bartlett and EV charger installation in Collierville follow their own local codes. Our EV charger FAQ covers the basics.
Nearby
Homes near Cordova can fall under a different county, permit office, or code. Pick an area to compare.
Shelby County
The Town of Collierville permits EV charger work through its Building & Codes Division under its amended code.
See Collierville detailsShelby County
Germantown electrical permits go through the Memphis and Shelby County code office. Learn the code, the utility, and what older homes should check.
See Germantown detailsShelby County
Bartlett runs its own code enforcement office and code. See who permits a charger, how storms shape outdoor installs, and where MLGW fits.
See Bartlett detailsShelby County (some addresses are in Fayette County)
Eads straddles a county line, so confirm your county first. Then plan for long wire runs and detached garage chargers on larger lots.
See Eads detailsFayette County
Piperton is in Fayette County, where the state handles electrical permits. See how the city and state split the work for a home charger.
See Piperton detailsSources
Get connected today
Tell a licensed local electrician what you drive, where you park, and what your panel looks like.
Call to speak with a local electrician about your EV charger install.
(901) 555-0100Get connected today